Amazon cover image
Image from Amazon.com

Report of the fifth Meeting of the Planning Group for the Coordination of Acoustic Surveys off Northwest Africa, Dakar, Senegal, 29-30 October 2006 = Rapport de la cinqie?me re?union du Groupe de planification pour la coordination des campagnes acoustiques au large de l’Afrique du Nord-Ouest, Dakar Se?ne?gal, 29-30 octobre 2006.

By: Contributor(s): Language: English Summary language: frn Series: FAO fisheries report ; no.827Publication details: Rome: Food and Agricultural Organization of the United Nations, 2007.Description: .vi, 47 p. ; 30 cmISBN:
  • 9789250057149
  • 9250057148
Other title:
  • Rapport de la cinqie?me Re?union du Groupe de planification pour la coordination des campagnes acoustiques au large de l’Afrique du Nord-Ouest
  • Fifth Meeting of the Planning Group for the Coordination of Acoustic Surveys off Northwest Africa
  • Cinqie?me Re?union du Groupe de planification pour la coordination des campagnes acoustiques au large de l’Afrique du Nord-Ouest
Subject(s): LOC classification:
  • ORG SH323 F36 no.827
Partial contents:
Introduction -- Follow up on recommendations made at previous session -- Review of survey results and experiences from 2005 -- Format of survey report -- Standardization of methods -- Planning of parallel survey by local research vessels and R/V Dr. Fridtjof Nansen, October-December 2006 -- Surveys planned for 2006 and 2007 -- Parallel survey with local research vessels and R/V Dr. Fridtjof Nansen, October-December 2006 -- Planning of calibration of acoustic equipment and intercalibration -- Identification of training needs and possible activities -- Other issues -- Recommendations.
Summary: All of the local research vessels had carried out acoustic surveys since the 2005 meeting of the Planning group. The analysis of the results of the coordinated parallel survey carried out in the fourth quarter of 2005 had shown that the variability of the allocation of recorded acoustic energy between the local vessels and the R/V DR FRIDTJOF NANSEN had been within acceptable limits. One coordinated survey was also carried out between the R/V ITAF DEME of Senegal and the R/V AL AWAM of Mauritania however no common report had been produced. The importance of doing so in the future was stressed. The countries are still working to find solutions with respect to problems related to noise levels and trawling as well as to ensure adequate funding for vessel operations. A plan to conduct a coordinated regional survey in October-December to continue the time series started with the R/V DR. FRIDTJOF NANSEN was made.--Publisher’s description.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Books Books Main ORG SH323 F36 NO.827 (Browse shelf(Opens below)) 1 Available 827001

At head of title: International Cooperation with the Nansen Programme, Coope?ration internationale avec le Programme nansen.

"GCP/INT/730/NOR."

"FIMF/R827 (Bi)"

Introduction -- Follow up on recommendations made at previous session -- Review of survey results and experiences from 2005 -- Format of survey report -- Standardization of methods -- Planning of parallel survey by local research vessels and R/V Dr. Fridtjof Nansen, October-December 2006 -- Surveys planned for 2006 and 2007 -- Parallel survey with local research vessels and R/V Dr. Fridtjof Nansen, October-December 2006 -- Planning of calibration of acoustic equipment and intercalibration -- Identification of training needs and possible activities -- Other issues -- Recommendations.

All of the local research vessels had carried out acoustic surveys since the 2005 meeting of the Planning group. The analysis of the results of the coordinated parallel survey carried out in the fourth quarter of 2005 had shown that the variability of the allocation of recorded acoustic energy between the local vessels and the R/V DR FRIDTJOF NANSEN had been within acceptable limits. One coordinated survey was also carried out between the R/V ITAF DEME of Senegal and the R/V AL AWAM of Mauritania however no common report had been produced. The importance of doing so in the future was stressed. The countries are still working to find solutions with respect to problems related to noise levels and trawling as well as to ensure adequate funding for vessel operations. A plan to conduct a coordinated regional survey in October-December to continue the time series started with the R/V DR. FRIDTJOF NANSEN was made.--Publisher’s description.

Text in English and French.

1

There are no comments on this title.

to post a comment.

Home | About ENAL | Collections | Services | Activities | Calendar | Contact us

7 Nadi El Sayed St., Gizah, Egypt | Phone: +02-33351313 | Fax: 202 33351302 | Email: enalegypt@gmail.com